
Incinerator with Wet Scrubber
● Secondary combustion up to 1100°C
● Venturi spraying & packed tower treatment
● Rapid cooling and harmful gas removal
● Cyclone dust removal and dehydration
● Efficient flue gas purification system
The flue gas produced after the waste is burned twice will be purified by Venturi tube spraying system, packed tower and cyclone dust removal equipment. These engineered sections combine to form a highly efficient system for the neutralization and filtration of the exhaust gases.
Working process
1. The high-temperature mixed flue gas enters the secondary combustion chamber for secondary combustion, and the temperature reaches about 1100℃. The flue gas stays in the secondary combustion chamber for more than 2 seconds, killing germs and eliminating heavy metal objects in the flue gas.
2. After full combustion, the high-temperature flue gas moves backward and enters the venturi dust collector, where the cooling water sprayed in is fully mixed with the flue gas, and the flue gas temperature drops rapidly to about 200℃, removing chlorides, fluorides, sulfides, nitrogen oxides, dioxins and other harmful substances in the flue gas. The flue gas continues to move backward and enters the packed tower scrubber, where the mixed flue gas and liquid are fully contacted again (end face air flow velocity 0.5-1.0m/s, flue gas outlet temperature below 100℃, liquid spray density 10m3/hm2).
3. The low-temperature flue gas containing water enters the cyclone dust collector, and the water in the flue gas is separated by centrifugation and conical concentration. The dehydration rate is above 98%. The separated water flows back to the sedimentation tank and then recycled;
4. The dry flue gas (about 80℃) after dehydration is directly discharged through an independent chimney under the action of the induced draft fan.
Structure


Technical specifications
|
Model |
YSL-50V |
YSL-100V |
YSL-500V |
|
Primary Combustion Chamber Volume |
0.6 m3 |
1.2 m3 |
4.0 m3 |
|
Secondary Combustion Chamber Volume |
0.3 m3 |
0.6 m3 |
1.5 m3 |
|
Burn Rate |
Up to 50kg per hour |
Up to 100kg per hour |
Up to 500kg per hour |
|
Gas Retention in Secondary Chamber |
2 seconds |
2 seconds |
2 seconds |
|
Operational Temperature |
> 850°C |
> 850°C |
> 850°C |
|
Burner Power and Fuel Consumption for Combustion Chamber |
Power: 0.11kw, fuel consumption: 6~10kg/h |
Power: 0.11kw, fuel consumption: 6~10kg/h |
Power: 0.18kw, fuel consumption: 10~20kg/h |
|
Burner Power and Fuel Consumption for Secondary Chamber |
Power: 0.18kw, fuel consumption: 7~14kg/h |
Power: 0.18kw, fuel consumption: 10~20kg/h |
Power: 0.37kw, fuel consumption: 15~30kg/h |
|
Blower power |
0.55kw |
0.75kw |
No.1: 0.75kw No.2: 0.75kw |
|
Chimney |
Outer diameter:Φ330mm, height: 12m |
Outer diameter:Φ400mm, height: 12m |
Outer diameter:Φ460mm, height: 12m |
|
Overall Size(without chimney) |
6000×3000×2500mm |
8000×5000×2800mm |
8000×5000×3600mm |
|
Fuel types |
Diesel, LPG, N-Gas |
Diesel, LPG, N-Gas |
Diesel, LPG, N-Gas |
|
Voltage |
220V/50Hz/60Hz; 380V/50Hz/60Hz |
220V/50Hz/60Hz; 380V/50Hz/60Hz |
220V/50Hz/60Hz; 380V/50Hz/60Hz |
|
Weight |
6000kg |
8700kg |
9800kg |
|
Door Size |
620×800mm |
700×900mm |
600×800mm |
|
Induced draft fan |
3.0kw |
3.0kw |
4.0kw |
|
Circulating water pump |
2.2kw |
2.2kw |
No.1: 2.2kw No.2: 2.2kw |
Optional Configurations
- Automatic feeding system
- Flue gas treatment system (scrubber)
- Ash removal system
- Mobile/containerized design






Hot Tags: incinerator with wet scrubber, China incinerator with wet scrubber manufacturers, suppliers, Clinical medical waste Incinerator, Compact incinerator, Household waste incinerator, Incinerator For Medical Waste Disposal, Medical Waste Incinerators, sheep incinerator
You Might Also Like
Send Inquiry










